-
STOP PLUTONIUM - Greenpeace





STOP PLUTONIUM

Documents and reports

Security Assessment Report for Plutonium Transport in France
Ronald E. Timm - Certified Protection Professional - March 2005
Report PDF - 572ko

Summary PDF - 18ko

Plutonium Transports in France - Safety and Security Concerns over the FS47 Transportation Cask
Y. Marignac, X. Coeytaux, J. H. Large - 21 September 2004
PDF - 509ko


IAEA Requirements on Design Basis Threat Assessment - Non Compliance of Eurofab Shipment from US to France on UK Vessel: Security and Physical Protection Issues
J. H. Large, Y. Marignac - 20 September 2004
PDF - 223ko


US Mox "Lead Test Assembly" Controversy : Fabrication at Cadarache, France - PDF

U.S MOX "Lead Test Assembly" Controversy: Fabrication at Cadarache, France - If too dangerous for European fuel, why just right for U.S. weapons plutonium?
Briefing for Greenpeace International.
WISE-Paris, 30 July 2003, version 1 - File in PDF format (16 p., 325 Ko)
http://www.wise-paris.org/english/ourbriefings_pdf/030729BriefLTA.env1b.pdf

Plutonium Investigation , "Special Cadarache", no. 20, April-May 2001.
http://www.wise-paris.org/english/ournewsletter/20/contents.html

ATPu (Plutonium Technology Facility) at Cadarache
WISE-Paris, 21 August 2000, version 4 - File in PDF format (11 p., 72 Ko)
http://www.wise-paris.org/english/ourbriefings_pdf/000821BriefCAD1v4.pdf
Annexes (only in French) : File in PDF format (12 p., 843 Ko)
http://www.wise-paris.org/francais/nosbriefings_pdf/AnnexesBriefCAD1v3.pdf


More reports

 
 

 

 

 

 

 


Site officiel de Greenpeace
-

La campagne Nucléaire de Greenpeace